Friday, March 4, 2011

Ny State Disability On W2

happened this week ...

This Week happened at the house much. Attention, flood pictures ;-)

Tadaaa ... We finally have electricity in the house. Here is our super trendy electric meter:)

addition, We get our dry wall in the bedroom for the end of our walk-in closet:




Our bathroom got the first coat:





The columns of the filigree top and cut-outs of the spots in the EC and KG have been filled and reinforced:




outside was already built up a part of the framework for the external plaster:


And in about two weeks, our solar system mounted:)



0 comments:

Post a Comment