Friday, November 27, 2009
What Does The Netral Wire Do In A House
Gradually, I have planned for the last 4 months, further work on the house and garden and implemented.
were first additional paving work on the series. We left the house around a paved road and the terrace (4x7m).
Then we wanted the upper soil layer (about 5cm), including removing weeds and distribute the excavation of foundation in the garden. As the excavation (20m ³) was completely mixed with weeds, we have disposed of it and filled the land with approximately 120m ³ of fresh (sieved) soil.
same time, I got the network sockets connected, set the network connection in the house cabinet space under the ceiling, two built-in patch panel and opened all the cables.
After some back and forth, I then aligned with a friend up the satellite dish so that we can finally television. Even with expensive art, it was not so easy to align the dish correctly.
On 5 September, we were then in Völksen (Springer) during lamp factory sales by Paul Mann. Hoping to find maybe one or the other lamp we are on Saturday went there with a friend there. Thank you to my colleague Marc and Stephan for the tip.
It was worth it. For almost everything we bought and planted bulbs on the same day. For the garden I am unfortunately not found it. The table lamp but we are still not appropriate, since the lightweight wall to the kitchen is not finished.
Even before we had a garage or carport considering to build. In mid-August and then we have chosen a (concrete) with attached garage.
Here I had negotiated with several companies. Ultimately have and we decided to tap the company . So
submit planning application and wait .... After 5 weeks we had the approval finally in hand. The building permit for our house had used only 2 weeks!
early November meant to arrive at the garage.