I the last 3 months I have neglected my site diary, unfortunately, very much. This I will do in the coming days.
Here is a brief summary what all happened: shelves in the house wiring space built
- Much of the paving is completed, including a large terrace
- network cabling is ready
- satellite dish is finally adjusted
- lamps all rooms installed (table lamp is missing)
- dryer was broken -> Fixed (starting capacitor replaced)
- mirror cabinet for bathroom, drawers and shoe rack for the entrance area, lounge area for the kitchen purchased and delivered
- glass sliding door between the kitchen and living room in the fall installed (light wall is missing)
- populated land with topsoil
- turf laid
- power cable, irrigation and water outlets buried in the garden / installed
- garden pump put into operation (beyond turf)
- garage ordered, foundations created (delivery Morning!)
- abgeschottert driveway for the delivery of the garage
- garden fence with the neighbor set
- ...
As the weather gets worse and colder now I can do out there any more. So, stay more time to work in the house and nachzupflegen Construction Diary.
Here are 2 pictures ever:
0 comments:
Post a Comment