Here is a brief summary what all happened: shelves in the house wiring space built
  • Much of the paving is completed, including a large terrace
  • network cabling is ready
  • satellite dish is finally adjusted
  • lamps all rooms installed (table lamp is missing)
  • dryer was broken -> Fixed (starting capacitor replaced)
  • mirror cabinet for bathroom, drawers and shoe rack for the entrance area, lounge area for the kitchen purchased and delivered
  • glass sliding door between the kitchen and living room in the fall installed (light wall is missing)
  • populated land with topsoil
  • turf laid
  • power cable, irrigation and water outlets buried in the garden / installed
  • garden pump put into operation (beyond turf)
  • garage ordered, foundations created (delivery Morning!)
  • abgeschottert driveway for the delivery of the garage
  • garden fence with the neighbor set
  • ...
missing on the list of security still a few things. But I will submit everything (including photos).

As the weather gets worse and colder now I can do out there any more. So, stay more time to work in the house and nachzupflegen Construction Diary.