tiles
Am 29.6. was the tiles delivered. The tiler was in 1.7. the wall tiles in the bathroom and separate WC (OG ) glued. With the floor tiles he has only from 10.7. because the screed still cool had .
On Friday, the first tile has the kitchen and then finished the guest bathroom tiled . I had installed on the last weekend for the shower tray . We had us during the construction phase the shower but decided to install same, but the shower comes later. The shower tray When the carrier and we had already bought a few weeks ago and I had to now install only.
(The Borde in the bathroom is a real stone shelves and not a mosaic.)
On Saturday, he then tiled or house wiring space and such a corridor .