yesterday we moved. On Friday, I had already picked up our truck, so we lose time. It really took off at 9. With 8 men and 3 women, we have the 7.5 - Loaded Tonner and our Passat . With The weather was also lucky. The big rain came after loading or after unloading. Perfect!

The UMTS card from a friend I have to bridge a few days until our phone line is switched. More information is

it later.

Thursday, July 23, 2009

Laser Lithotripsy Cost In Rs.

house delivery and successful parade moved on Saturday!

Unfortunately, we currently need any last minute to work on the house to carry out or to pack things. Therefore I do not come to the last two weeks nachzupflegen . Photos are made but for the preparation and writing of the blogs I have no time.

most important point was the current house delivery. A few small flaws, I have claimed, but otherwise everything is fine.

weekend is moving and unfortunately I will not write to make it until then anything else. The other problem is the phone connection that we are only at 6.8. . Get

Sunday, July 19, 2009

Causes Of Very Skinny Legs

6 days left

the moment I can not make it a construction diary to maintain.

On Friday, the kitchen was delivered and the paving work has begun. The tiles in the bathroom ( OG) are also nearing completion. Unfortunately, the tile three tiles too little! On Monday last three are glued (Super Glue) and grouted. In addition, the study and the living room tiled . There

photo is well again until next week.

Thursday, July 16, 2009

Naine Jansen Schwimmbad

info

The countdown is running. Only 9 days to move.

Unfortunately I do not do right now to document everything. I will hopefully make up for the weekend.

What all happened this week:
  • cork parquet floor laid in
  • stairs and doors are installed
  • cotton as a plaster ceiling in ground floor and two bathrooms
  • furniture for the children of our 3-year-old daughter bought

Tomorrow will also be plenty going on in the house:
  • delivery of our new kitchen
  • completion of sanitary work (installation of toilets, sinks in the bathrooms ...)
  • start of paving

Sunday, July 12, 2009

Are Buffalo External Hdd Good?

tiles

Am 29.6. was the tiles delivered. The tiler was in 1.7. the wall tiles in the bathroom and separate WC (OG ) glued. With the floor tiles he has only from 10.7. because the screed still cool had .

On Friday, the first tile has the kitchen and then finished the guest bathroom tiled . I had installed on the last weekend for the shower tray . We had us during the construction phase the shower but decided to install same, but the shower comes later. The shower tray When the carrier and we had already bought a few weeks ago and I had to now install only.

(The Borde in the bathroom is a real stone shelves and not a mosaic.)

On Saturday, he then tiled or house wiring space and such a corridor .

Vegas Themed Wedding Card Messages

final coat (part 2)

Done! All rooms are painted ready .... and I'm ready.

our color, we had purchased before the first coat. Our older daughter had a clear idea in advance for the walls in her room: Purple + orange! So
two walls purple, the rest orange. The colors we've chosen not too dark, so rather lilac and bright orange.

for our bedroom, I have enforced me: savannah + almond white.
The hallway, living room and study should be almond white. Mind you ARE! The kitchen is white.

On Friday (3.7.), I then started in the nursery, the walls and ceiling orange deleted.

On Saturday, a larger program was scheduled. With the support we have first removed the bedroom with almond and white. I knew that the color not sufficient to entrance hall, lounge and would work had, in the morning even bought a bucket.

When the floor was almost finished and we opened the second bucket of paint I had nearly had a screaming fit. The color looked much brighter, although the two buckets were from the same production batch. So pack up buckets, convert Hardware. precaution course, we have opened the bucket. Apparently was the first bucket, which was now empty, not in order. So we had to cancel the hallway again. Until the evening then another part of the work room be deleted. New Color: Vanilla!


On Sunday, I then painted our bedroom and in the afternoon with support yet done work done. On Monday I was then the kitchen painted white. The final coat the children did I do on Wednesday.

Sunday, July 5, 2009

Unique Prom Dresses Under 60

final coat (part 1)

was this weekend again strike action.

from Friday to today, bedroom, hall (ground floor + first floor), living room and study become ready. The two children are also almost ready. Tomorrow (Monday) will continue until I reach: The objective is to remove the kitchen, because the tile will finish on Wednesday for the rest. I will also try to stress the finished nursery.

Wednesday, July 1, 2009

How Does Lifebook Pen Work

tiles

Since the heating in the last week the screed has heated up, it's in the house at the time very warm and the humidity is very high. Every day let me reveal at least two times. On the weekend we drying program finally be through.

The tiler was in there this week, and has in the guest toilet and bathroom walls tiled . The tiles in the bathroom (floor ) already looks very good. Let's wait until everything is finished.

The floors can be until next week tiled be because of the cool must first floor.

Denise Milani Boobs Nipils

painting

weekend was great string action. We missed almost the whole house an indoor painting. I had already started on Friday and Saturday to get some help (many thanks). On Sunday, I still have a few remaining tasks and the first two walls of the missed final coat.

we wait once down, the end result will look like. Pictures are deleted when the rooms are ready.