Thursday, January 27, 2011

African American With Ringworms

Tadaaa .. the screed is here :-)

Yesterday was pouring the cement floor.
hallway floor:


kitchen

living-dining room:


WC EC:

work ornamental EC:

bathroom floor:

hallway floor:


bedroom with walk-in closet:


Room 1 upstairs:

Room2 OG:

in the basement goes to the heater and water lines also the end of:



The tiles for the basement:

0 comments:

Post a Comment