Saturday, January 29, 2011

Why Wont My Caw Go On Line

first sushi experiments

Today we tried the first time even to make sushi. Is not that bad ;-) become

(left: vegetarian with cucumber, right: with smoked salmon and cucumber)


And so we did it:

300g sushi rice ; give with 450ml water in a large pot and 2 min. cook on highest setting with the lid closed. Then, 10 min. continue to cook on low setting can (lid still on). Remove the pan from the heat and put it in place of the cover a dish towel. Sun rice for 10 minutes. can evaporate. Then the rice in a baking dish and about 20g instant rice vinegar-sugar mix in . Distribute the rice in the casserole dish and move along notches. Wait until the rice is at room temperature and then to a nori (for our portion, we used three nori sheets) distributed , lying on a bamboo mat. This can be at the top 2cm empty. Ca. 1cm from the bottom edge first, something Wasabi and Japanese Mayo and underline the fact smoked salmon and / or cucumber place. Then roll up from the bottom up using the bamboo mat the whole and then cut into slices.

given some warm Sake for drinking and "dips" Wasabi mix with soy sauce in a small bowl .


Thursday, January 27, 2011

African American With Ringworms

Tadaaa .. the screed is here :-)

Yesterday was pouring the cement floor.
hallway floor:


kitchen

living-dining room:


WC EC:

work ornamental EC:

bathroom floor:

hallway floor:


bedroom with walk-in closet:


Room 1 upstairs:

Room2 OG:

in the basement goes to the heater and water lines also the end of:



The tiles for the basement:

Tuesday, January 25, 2011

Request For Free Prom Dress Catalogs

The floor is almost finished

Today was further moved the floor. Up to half of Room1 Room2 and the upstairs is all done already.

are also our tiles for the basement come:

corridor on the floor:


toilet floor:

work:

kitchen

living room:

living room and dining area:

bathroom upstairs:

Here goes to the shower:

And here you go to the toilet:

Toilet:

Bedrooms upstairs:

... with WIC:

Room1:



Saturday, January 22, 2011

Metal Core Boss Diagram

Weiter gehts plastered finished with radiant heating floor heating

was yesterday laid the floor in the kitchen already and the rest of the house continues to prepare for it.
was also set the tub in the bathroom already.

Here the laid floor in the kitchen:

And here are the bath :-)


Thursday, January 20, 2011

Bestconditioning Mascara

and early

today was finally plastered finish. In addition, the substructure was laid for the floor.

finished plastered bathroom on the floor ...

goes here Basin:

Click here for the shower behind:

Shower:

Right goes to the shower, next to the toilet in the middle of the basin is:

Click here for the toilet behind:

Toilet:

bathroom floor:

preparation for floor heating in the bedrooms upstairs ...


... in Room 1 upstairs ...





... in Room2 upstairs ...




preparation for floor heating in the office at the EC ...

... in the living room on the ground ...


... in the kitchen ...