Monday, January 18, 2010

What Kind Of Oil Should I Use On Yamaha Razz

blower-door test

Last week, the plumbers in the house have done all the work. The sanitary elements are in the bathroom, the floor heating is installed, the toilets were prepared, all heating / pipes are installed and connected all the drains. However, we were a bit "surprised" as we saw in between during a visit to the site funny faces, large and small boxes Ottifanten games on our fresh plaster, which had probably been immortalized in a break there. We are now better than non-small-checkered, but eventually we need to save for our dream home and small later it is we, the need to remove the plaster (hopefully not that often). So we have asked our sometimes naive construction manager, whether that is in construction "normal". Well, he was as "surprised" as we do, and it has looked at his next visit. And so we now have no more Ottifanten to our living room wall ...


Today was then carried out of the blower-door test. It was not very spectacular but still very interesting to learn where our "weak points" are. We have passed the test without problems with a value of 1.2 (maximum is 3.0), some things still need to be improved. The windows are partially something is leaking, there are also the outputs of the tubes several passages. The friendly examiner said that this error be corrected on now in quality and build status quickly ECO especially Mr. Carstens - our construction manager - here are also very conscientious. It is good to hear!


the moment we are dealing with the selection of our carpets and have seen a very beautiful hardwood floors and great offers. Since we have been blessed with the luck carpenters in the family to be, we have experts here on our side.
We also look at our offers for the paving of more accurate and are always on the huge price differentials surprised. That makes choosing easier but not really because you do indeed have to ask where these came from different ...

In the coming days, poured the floor in the house. So we are currently building a temporary order to build on heating without him having to enter (adventurous, but goes ;-)))). The first 4 days may not enter the floor, but the temperature must not fall below 5 ° C. To ensure this, we have been advised to this solution. Let's see obs works.
The plaster is by the gas heater is already very well dried. Have her go on :-)

0 comments:

Post a Comment