Today I found finally a few photos to document the construction process and nachzuliefern:

from 13 July I had started with the support of cork flooring move (thanks Jan). Both children, bedroom and flight upstairs, we have designed with cork flooring.



Our Kitchen was originally on Tuesday the 14th . Come Fortunately, I had to move the date to Friday, because on Tuesday, both doors and stairs were installed, and from Tuesday to Thursday we still have cotton on the ground floor to the ceiling in the bathroom (floor) and WC (EC) can squirt them on the wall .


this end, the ceilings and walls, white on the first day primed. The next two days, a layer was sprayed on cotton. To this end, the pure cotton (almost looks like pressed cotton wool) soaked in water until it is swollen. This slurry is then treated with a spray gun on the wall and ceilings sprayed. In the bathroom and toilet, we have added small silver stripes and gray tiles, in all other areas of the pearl cotton.


A tip from our neighbors was great. It takes the Hall from the rooms and looks very good.

On Thursday we went to buy some furniture for the nursery:


On Friday, the kitchen was built. From about 8:30 to 15:30 h two men have built up our kitchen. Now we can at least have something cooking, and wash off.


At the same time was the plumbing and heating company in the house and has the washbasins, toilets, etc. installed. The towel radiator in the bathroom, they have been brought but only on 22 installed when I got the briefing for the heating system.

On Saturday the 18th , the tile then tiled the floor in the bathroom (floor), on Monday and Tuesday (20 and 21) still living and study.


weekend we have started with a girlfriend a big cleaning project in the house and built the first furniture.


came at Tuesday shower for our walk-in shower (bathroom floor).


now had to be prepared to move. In recent weeks we have already packed boxes and stacked in the basement. Altogether there were 40 cases. On Thursday and Friday we began to disassemble the furniture.

have also disposed of in the two weeks we have three followers loads of scrap in the landfill.